Liverpool Riverbank Stabilisation
MN Builders faced a critical issue with erosion threatening their new development along the Georges River.
Erosion along the Georges River was damaging the riverbank, risking instability and long-term harm to MN Builders’ project.
Austral Construction installed 313 tubular steel piles using the Rotopile method, followed by 307 sheet piles and 55,000T of rock, successfully stabilising the riverbank and preventing future erosion.