Swanson Dock Wharf Upgrade

Austral Construction has made history at Melbourne’s Swanson Dock with the installation of the longest single-length raked piles ever driven in Australia.

The project aimed to refurbish the ageing dock structures and extend their operational life. Faced with logistical challenges in a bustling port and the discovery of hard basalt, Austral’s innovative piling methods and expertise allowed the project to finish on time and within budget, ensuring future dock stability.

The Project

Related projects